Prince Edward County Municipal Services

Residents

One-stop-shop for all your needs related to municipal services as a resident of Prince Edward County.

 

 

Business

Find the info you need on relocating, starting or expanding your business in Prince Edward County.

Visit

Explore what Prince Edward County has to offer for residents and visitors alike.

 

 

Public Notices:

No burn ban -- Open air burning allowed  Fire Chief Robert Rutter has...

Read More

Road Reconstruction

Roads where both the surface and subsurface structure have failed typically require reconstruction with new base and subbase. Generally, full road reconstruction requires some design work or study by external consultants before reconstruction can begin. Road reconstruction projects may also be undertaken in conjunction with underground water and wastewater infrastructure renewal.

Due to the complex nature of road reconstruction projects, the Development Services Engineering group leads the road reconstruction program.

The road reconstruction and design work planned for 2021 includes:

Reconstruction

  • Completion of Loyalist Parkway from Cold Storage Road to the Millennium Trail
  • Picton Main Street from Bridge Street to Spencer Street (road reconstruction combined with water and wastewater infrastructure renewal)
  • Elk Street (road reconstruction combined with water and wastewater infrastructure renewal)

Design

  • Talbot Street to the Millennium Trail (road reconstruction combined with water and wastewater extensions)
  • County Road 4 from Millennium Trail to County Road 34
  • Barker Street (road reconstruction combined with water and wastewater infrastructure renewal)
  • A portion of Bowery Street (road reconstruction combined with water and wastewater infrastructure renewal)
  • County Road 49, which is currently approved by Council for design works in anticipation of reconstruction. The design consultant will be providing an evaluation of two options with either a concrete or asphalt surface. Staff will bring a report with recommendation to Council for decision, following which, detailed design will be finalized with estimated costing that will be used to inform the 2022 budget.